Representative Projects

 

EXTENSION AND REFORM OF THE DEPARTURE HALLS FOR THE STATE AIRPORT OF HERAKLION “N. KAZANTZAKIS”

 

 

The project includes the electromechanical installations for the extension (2.000 sq. mt.) of the existing Airport Building and the reform of the three (3) departure halls Intra Schengen, Intra-Extra Schengen and Extra Schengen.

The extension works of the Airport have been organized in phases so as not to disturb the operation of the Airport.

The following electromechanical installations have been included:

  • Electrical Power Installations
  • Plumbing Installations
  • Fire Fighting System
  • Heating, Ventilating and Air Conditioning
  • Electrical Low Current Installations
    • Voice – Data
    • R-TV
    • Time Distribution System
    • Public Address System
    • Fire Detection
    • Closed Circuit Television (CCTV) System
    • Building Management System (BMS)
  • Elevators
  • Lightning Protection and Grounding
  • Building Surrounding Area Installations
  • Flight Information Display System (FIDS)

 

Above installations have been designed in a final stage and the tender documents have been prepared.